What you receive

The SyncPoint analysis.

One readable report your crew and your command staff can both use — generated from the audio, video, and timestamps you upload.

SyncPoint

Upper Darby Township Fire Department · Working Apartment Fire w/ Entrapment

For demonstration — not an official record
0%Compliance
Alarm Processing
-45s
Response
-35s
Turnout
-35s
Travel
+15s
CriteriaMetricTime
Travel PerformanceDispatch → Arrival6:40
Engine Company EffectivenessArrival → Water On Fire3:35
Life Safety PerformanceArrival → Primary All Clear5:50
Coordination ProofVent start → Knockdown0:40
Fire Control EffectivenessWater On Fire → Knockdown3:10
Incident ManagementArrival → Under Control15:20
Total Incident Duration53:55
Staffing Levels: 4E / 2TWater Supply: YCommand Established: YOn Scene Report: Y360 Complete: PARTConditions Evident: YVictim Located: YVictim Rescue: YVictim Removed: YOccupancy: APTStories: 3Mayday: N

On Scene Report

First unit arrived +6:40 after dispatch for a working apartment fire with occupants trapped by smoke. Second-floor unit fire in a three-story occupied apartment building; command established, water supply secured, interior attack and ladder rescues initiated. Water on fire +10:15; primary all clear +12:30; knockdown +13:25; under control +22:00. NFPA 1710 compliance: 75% — travel performance flagged over target.

Live sample — Upper Darby Township FD demonstration record.

Six things in every analysis.

Incident Timeline Reconstruction

Every action anchored to a CAD record, a transcript utterance, or media — one unified timeline.

Tactical Analysis

NFPA 1710 compliance times and a compliance score, calculated from your timestamps.

Communication Analysis

Dispatch and fireground radio traffic transcribed and correlated to operational events.

Decision-Point Review

The size-up, working-fire call, and key transitions surfaced in sequence.

Training Opportunities

Concrete, blame-free lessons your officers can take to the drill ground.

Operational Insights

Time-to-task metrics and trends across every incident you analyze.

Inside the sheet

NFPA 1710 compliance

Alarm processing, turnout, travel, and total response times measured against the standard, with a compliance score.

Criteria & time-to-task

Dispatch-to-arrival, arrival-to-water-on-fire, primary all-clear, knockdown, and under-control intervals.

Conditions & outcomes matrix

Staffing, water supply, command, 360, victim located/rescued/removed, occupancy, mayday — at a glance.

On-scene report

A clear written reconstruction of the incident, anchored to your timestamps.

See it on your incident